phase I development path 218 m Green roof + solar infrastructure Greenhouses Green roof terraces DESAR organic waste treatment Solar heat collectors Reedbed filtration HOUSE BOATS: 6300 sqm (30) JETTY: 1635 sqm In phase one, the individual sections of the jetty are built as homeownersacquire their mortgages. This construction pattern is tied to the financing structure of the project. As seen on the above map, this phase includes the construction of the the decentralized waste treatment system inside of each pier (seen in purple), the floating helophyte filters, and the installation of some of the rooſtop infrastructure including: green roofs, greenhouses, and solar heat collectors. 70 / 146 2 4 m 44 m 5 m 3 m 10 m 31 m 24 m 24 m Pagina 69